Stormguard Roof Works of Costa MesaCosta Mesa’s shortcut to three honest roofing quotes.What it costs

Guide

How a roof claim actually works

A roof claim is a documentation exercise. The damage matters, but what you can prove about it matters more.

Guide7 sections1 min readCosta Mesa, CA

Get it looked at

Three questions, and up to three Costa Mesa contractors. Free either way.

Free · Up to three quotes

Get it looked at

Three questions, and up to three Costa Mesa contractors. Free either way.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Nothing is charged and nothing is booked.

Stop further damage, and keep the receipts

Policies expect you to take reasonable steps to prevent things getting worse, and they generally reimburse the cost of doing so. Tarps, emergency call-outs, a temporary patch. Keep every receipt.

Get an independent assessment first

A written contractor assessment before the adjuster visits gives you a scope to compare against. If the two disagree, ask for the contractor to be present at a re-inspection — it changes the conversation considerably.

Photograph everything, immediately

Take far more pictures than feel necessary, including undamaged areas for comparison. Do it before the tarp goes on, not after.

Read anything before you sign it

An assignment of benefits hands control of your claim to a contractor. There are legitimate uses for it and it is also the single most common way homeowners lose control of a claim. Never sign one on the doorstep.

Know what your policy actually pays

The two clauses that decide the cheque are the settlement basis and the deductible. Some policies also carry a separate, larger deductible for wind and hail.

Mind the deadline

Policies impose time limits on reporting damage, and they are shorter than people assume. Damage found late — hail in particular — is often denied simply because too long has passed.

In short

Document first, mitigate second, file third. In that order it usually goes smoothly; in any other order it usually does not.

Related questions

How many contractors will contact me?

No more than three. We picked that number because two quotes is not enough to spot an outlier and five is an ordeal.

Should I repair or replace?

Rough rule: if the covering has more than about five years left and the damage is confined to one area, repair. If it is at the end of its life or you are patching the third leak in two years, you are paying instalments on a replacement.

Can I stay in the house while it is done?

Most people do. Expect noise from early morning, dust in the attic, and a day where the driveway belongs to the crew.

Get it priced

No cost, no obligation, and never more than three contractors.