Stormguard Roof Works of Costa MesaCosta Mesa’s shortcut to three honest roofing quotes.What it costs

Guide

The questions that separate the quotes

Ask all three contractors the same list. Comparing the answers is far more revealing than comparing the totals.

Guide7 sections1 min readCosta Mesa, CA

Get it looked at

Three questions, and up to three Costa Mesa contractors. Free either way.

Free · Up to three quotes

Get it looked at

Three questions, and up to three Costa Mesa contractors. Free either way.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Nothing is charged and nothing is booked.

"What underlayment, and how are the valleys done?"

This is the question that reveals whether you are comparing the same roof. Underlayment, ice-and-water placement, drip edge and valley treatment are where quotes quietly diverge.

"What does your workmanship warranty cover, and for how long?"

Ask for it in writing, in the company name, with a term. Five to ten years is common; the term matters less than whether they will still be trading.

"Who is actually doing the work?"

Ask how long this specific crew has worked together. Roofing companies keep their name and change their hands more often than most trades.

"What is your licence number, and who holds it?"

Then look it up. You are checking that the licence is current and that the name on it matches the name on the contract you are being asked to sign.

"Can I see a job you finished five years ago?"

Anybody can show you a roof completed last month. A roof that has been through five winters shows how the edges, valleys and penetrations were actually detailed.

"What happens if the decking is rotten?"

You want a rate, not a reassurance. Some rot is likely on any older roof and the rate is the only thing that keeps that predictable.

In short

Six questions, three contractors, one afternoon. It is the cheapest insurance available on a job this size.

Related questions

Is moss on the roof a problem?

Yes, eventually. Moss holds water against the shingle and lifts the edges as it thickens. Zinc or copper strip at the ridge suppresses it. Pressure washing an asphalt roof strips the granules and does more harm than the moss did.

What warranty should I expect?

Two separate things. The manufacturer covers the material for its rated life, but only if it was installed to their specification. The contractor covers workmanship, commonly five to ten years, and only for as long as they are trading.

What if the decking is rotten underneath?

Some of it usually is. The important thing is that the price per sheet is agreed in writing before the tear-off, so the conversation on day two is about quantity rather than rate.

Get it priced

No cost, no obligation, and never more than three contractors.