Costa Mesa, CA
Find out what you are actually dealing with
Buying a house, selling one, or arguing with an insurer — all three go better with a written roof report in hand.
Describe the inspection job
Three questions, then the address. Up to three Costa Mesa contractors who do this work.
Your request is in.
We are matching it now against roofing contractors working in Costa Mesa and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Before you let anybody on the roof
The things worth pinning down on a inspection job. A contractor who has not raised them has not looked properly.
- An estimated number of years left in the covering
- Photographs of anything they flag
- A written report, not a verbal summary
- Whether the inspection includes going into the attic
- Whether the fee comes off the job if you proceed
Ask for an estimated remaining life in years, and what would extend it. That answer is the useful part.
The point of an inspection is not to find a disaster. It is to find the two hundred dollar problem before it becomes a twelve thousand dollar one.
Free inspections are tied to an estimate, which is fine as long as you know that going in. Paid inspections buy you a written report that is not attached to somebody wanting the work.
Locally
Then, less dramatically: shaded slopes that never really dry out. Nothing dramatic happens. A slope stays damp most mornings for thirty years, and eventually that is enough.
About inspection here
Why three quotes and not one?
One quote is a number with no context. Three gives you a range, and the conversation about why they differ is where you learn what you are actually buying.
How quickly will someone call?
Usually within the hour during working hours. If you marked the job as an emergency it goes to the front of the queue and is normally picked up faster than that.
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
Why does ventilation keep coming up?
Because a badly ventilated attic cooks the roof from underneath and takes years off it. Intake at the eaves and exhaust at the ridge, in balance. It is cheap during a re-roof and awkward afterwards.
