Stormguard Roof Works of Costa MesaCosta Mesa’s shortcut to three honest roofing quotes.What it costs

Costa Mesa, CA

Find out what you are actually dealing with

Buying a house, selling one, or arguing with an insurer — all three go better with a written roof report in hand.

Describe the inspection job

Three questions, then the address. Up to three Costa Mesa contractors who do this work.

Free · Up to three quotes

Describe the inspection job

Three questions, then the address. Up to three Costa Mesa contractors who do this work.

Step 1 of 6

What best describes your home?

Different buildings need different crews, so this is the first thing a roofer asks.

Nothing is charged and nothing is booked.

Before you let anybody on the roof

The things worth pinning down on a inspection job. A contractor who has not raised them has not looked properly.

  • An estimated number of years left in the covering
  • Photographs of anything they flag
  • A written report, not a verbal summary
  • Whether the inspection includes going into the attic
  • Whether the fee comes off the job if you proceed

Ask for an estimated remaining life in years, and what would extend it. That answer is the useful part.

The point of an inspection is not to find a disaster. It is to find the two hundred dollar problem before it becomes a twelve thousand dollar one.

Free inspections are tied to an estimate, which is fine as long as you know that going in. Paid inspections buy you a written report that is not attached to somebody wanting the work.

Locally

Then, less dramatically: shaded slopes that never really dry out. Nothing dramatic happens. A slope stays damp most mornings for thirty years, and eventually that is enough.

About inspection here

Why three quotes and not one?

One quote is a number with no context. Three gives you a range, and the conversation about why they differ is where you learn what you are actually buying.

How quickly will someone call?

Usually within the hour during working hours. If you marked the job as an emergency it goes to the front of the queue and is normally picked up faster than that.

How long does a re-roof take?

Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.

Why does ventilation keep coming up?

Because a badly ventilated attic cooks the roof from underneath and takes years off it. Intake at the eaves and exhaust at the ridge, in balance. It is cheap during a re-roof and awkward afterwards.

Get it priced

No cost, no obligation, and never more than three contractors.